Once again braving the snow, Troop 3 gathered on Sunday, January 31, 2021 to assist Aidan Kontir with his Eagle project. During the previous work session in December 2020, Aidan and the troop emptied a soccer shed at the park in preparation for building a new separating wall, shelves, ball boxes, and a workbench.

In January, Troop 3 returned with Aidan to install finish assembling the pieces he’d prepped offsite, as well as installing the larger scale pieces of his project.